Ordering partner

GasNet and Pražská plynárenská distribuce

Pipeline

6 sections of DN 700, DN 500 and DN 300 gas pipelines

Place of realization

Czech Republic

State of realization

Czech Republic, EU

Date of realization

2025

AUTHOR OF THE ARTICLE

Aleš Brynych

Go to the related items

  • Services
  • Case studies
  • About us
  • Communications
  • Contacts

Successful completion of six inspections in 2025

In 2025, CEPS successfully carried out off-line inspections with a total length of 64 km on six sections of long-operated gas pipelines DN 700, DN 500 and DN 300 operated by GasNet and Pražská plynárenská Distribuce.

Each inspection was performed using the standard combination of ultrasonic, magnetic and geometric inspection tools supplied by a single vendor, ROSEN. This approach enabled subsequent synergistic evaluation of the measured data using mutually interconnected evaluation algorithms.

 

 

 

 

 

 

 

 

 

PředchozíNásledující

Prior to the inspections, CEPS verified the sufficient piggability of the pipelines for inspection tools, including the detection and localisation of impassable parts. The pipelines were then thoroughly cleaned of dust, corrosion products, various construction debris (such as wooden beams, welding electrodes and other metallic objects, remnants of pipeline interconnection balloons and residual water), oil condensates and, in several cases, also of different forms of viscous deposits.

This cleaning was necessary to ensure that the tens of thousands of cubic metres of water used to propel the inspection tools through the pipelines would not become contaminated by remaining impurities when pumped into the pipeline. Consequently, the water could be legally discharged back into surface waters — based on water management permits issued for this purpose — without the need for subsequent treatment.

During the works, CEPS also applied several new cleaning and pumping procedures that increased operational efficiency and accelerated the overall execution of the activities.

Viscous deposits

Off-line inspections carried out in 2025

Section

Pipeline

Length [km]

1 DN 700 6 km
2 DN 700 5 km
3 DN 500 17 km
4 DN 500 17 km
5 DN 300 12 km
6 DN 300 7 km
Total   64 km

related services

The following services were provided with this project

  • All services

Nitrogen services

Pigging services – mechanical and chemical cleaning

Pipeline drying

services


related case studies

See related CEPS case studies

  • All case studies

Off-line internal inspection of pipelines – an important tool for investment decisions

Písecko–Strakonicko, Czech Republic
2016

New approach to the results of internal inspection

Džūkste–Peteri, Latvia
2013

case studies


related documents

For more documents and other information, see the section about us

  • All about CEPS

Key professional references

summary
1999–2026

ISO 9001
ISO 14001
ISO 45001
ISO 3834-2

about CEPS


related communications

Read articles related to this case study

  • All articles

Offline internal inspection in the Czech Republic

World Pipelines 4 / 2018

Comprehensive approach to the decommissioning of oil pipelines

Pipeline Technology Journal 4 / 2017

New approach to results of in-line inspection CZ

Plyn 7–8 / 2014

PETROL Magazín 2 / 2014

Alternative drive for inspection pigs CZ

Plyn 2 / 2013

Slovgas 2 / 2013

communications


contact

If you have any questions, do not hesitate to contact CEPS responsible persons

  • Contact us

Aleš Brynych

general manager – CEO

phone +420 241 021 547

info@ceps-as.cz

Filip Tesař

CFO and sales manager

phone +420 606 641 328

info@ceps-as.cz

Jana Brynychová

CCO and sales manager

phone +420 606 607 440

info@ceps-as.cz

CEPS a.s. Head office

phone +420 241 021 511
fax +420 241 021 512

e-mail info@ceps-as.cz

see all contacts and maps


© 2013–2026 CEPS a.s. / Technical specifications CZ / Contacts